CHESTERFIELD
MEWS COMMUNITY ASSOCIATION
ARCHITECTURAL CONTROL GUIDELINES
The Architectural Control Committee, established in the Declaration of
Covenants, Conditions and Restrictions (Article VIII), is charged with
the responsibility for interpretation and implementation of those
restrictive covenants which relate to the architectural and aesthetic
integrity of the Community. These guidelines supersede any
preceding published ones. Koger Management is responsible for an
annual architectural inspection of the properties.
The following general and specific guidelines amplify and supplement
the “Declarations” and should be read in conjunction with Articles
VIII, IX, X and XI of that document.
1.GENERAL GUIDELINES
A. Written approval must be obtained from the Committee prior to
undertaking any exterior alteration or improvement to any house, fence,
or other structure within the Community. These undertakings
include, but are not limited to, any painting or repainting, staining
or restaining, exterior additions or changes to any house or fence,
construction within fenced areas which will extend above the fence
line, any deck mounted change or addition which will be visible above
the fence line, or any new or additional fencing.
B. Prior written approval is required for addition or removal of any
plantings, or any other objects, on common grounds.
C. Approval of any project by the Committee does not waive the
homeowner’s responsibility for obtaining required County permits.
D. Obtaining required County permits does not waive the requirement for
Committee approval.
2.SPECIFIC GUIDELINES
A. Painting - areas that are painted may be repainted in the same color
only. Unpainted surfaces, such as brick, shall remain unpainted and
unstained. Whole surface areas must be repainted at the same
time. Fences are not and shall not be pained or stained - if
necessary, they may be treated with a clear preservative.
The exteriors of homes are a high-quality cedar plywood called “Texture
III”, which, with proper maintenance, lasts for many years.
Painting is required every five to seven years, retaining the original
colors (each building must be one color). The original paint used by
the builder was McCormick Flat Latex Neutral Gray, Moss Green, and
Antique Brass. McCormick Oxford Brown luster acrylic was used on
all trim. Comparable colors in Duron paint may be used only on
Readsborough Court and Delburne Court.
Place the paint color codes here??
B. Storm Doors/Windows - all installations require prior approval.
C. Roof-mounted objects - (Dish antennas) no exterior antenna for the
transmission or reception of any radio or television signal shall be
erected or permitted on any building or lot, or on any part of the
common property. Attic exhaust fans, stove chimneys, and other such
objects require prior approval.
D. Awnings, outdoor carpeting (at main entrances or in courtyards) and
the like are considered exterior changes requiring prior approval.
3.PROCEDURES
A. Only written requests will be considered by the Committee. These
should be accompanied by drawings, material lists, color samples,
product brochures, and other documentation which would indicate the
nature and extent of the desired undertaking.
B. Requests may be personally delivered to any of the Committee members
or mailed to:
Chesterfield Mews Community Association
Architectural Control Committee
P.O. Box 110
Fairfax, VA 22030
C. The Committee will consider and act upon all requests as soon
as possible, but in any case no later than thirty (30) days from
receipt of the request. All Committee replies will be in writing.